Railway facilities: |
You will find the technical characteristics of our facilities. |
|
The Trains: |
A compilation of all the rolling stock built by Tren de Palau. |
|
Timetable: |
If you want to visit us, here are our timetables |
|
La Nit del Tren: |
In the summer solstice "La Nit del Tren" is the principal feast of the Association. |
|
The Town: |
Inhabited since prehistoric times, this place appears in thousand years old documents |
|
Links: |
We are not alone in the world of trains. Here are some links to partners |
|
|
|
Railway facilities |
|
Technical Specifications |
Gauge |
256 mm |
Length of track installed |
2900 m |
Length of main circuit |
3150 m |
Height above sea level |
100 m |
Elevation gain |
9 m |
Maximum ramp |
28 mm/m |
Minimum curve radius |
29 m |
Stations |
5 |
Metal bridges |
3 |
Level crossings |
4 |
Switches |
20 |
Signals bridges |
1 |
Railway signals |
4 |
Overage speed |
10 km/h |
Tunnels |
1 |
|
|
|
|
|
|
The Line |
The line: |
|
The britges |
|
|
The level crossings |
|
|
The signals' box |
|
|
The track apparatus |
|
|
The track |
|
|
The tunnel |
|
|
|
|
|
Primer pont - Long Type |
|
|
|
Pont de Pedra - Parker Type |
|
Pont del Clot - Warren Type |
|
|
|
Level crossings |
|
Signal bridge |
|
|
|
Switches |
|
The track |
|
|
|
The tunnel - Pradell-La Torre de Fontaubella portal |
|
The tunnel - Montgat portal |
|
go up --->>> |
|
|
The Stations |
Terme |
Can Boada |
CB |
Estació |
Can Boada - Enllaç |
CBe |
Baixador |
El Pi Gran |
PG |
Baixador |
El Clot Mirador |
CM |
Baixador |
El Pont de Pedra |
PP |
|
|
|
|
|
Can Boada - CB |
|
|
|
Can Boada Enllaç - CBe |
|
El Pi Gran |
|
|
|
El Clot Mirador - CM |
|
El Pont de Pedra - PP |
|
go up --->>> |
|
Engine shed |
|
|
Engine shed |
|
|
Workshop |
|
|
Swing bridge |
|
|
Bridge crane |
|
|
Water crane |
|
|
|
|
|
Engine shed |
|
|
|
Workshop |
|
Swing bridge |
|
|
|
Bridge crane |
|
Water crane |
|
go up --->>> |
|
12-07-2021 |
|